The start of the tri-series one-day international cricket final between Australia and Pakistan was delayed due to a damp outfield.
Although the sun was out, the outfield was considerably damp due to rains over the last two days.
After an inspection, the umpires said the match could be delayed by one-and-a-half-hour to let the sunshine dry the outfield.
The match was scheduled to start at 1400 IST.